startup-tips
Sign in
UpcomingR&D programAuto-collected, not reviewed

Rapid Thermoplastic Patching Capability for Legacy Thermoset Airframe Sustainment

🇺🇸 United States·U.S. Department of War — NAVY(Government)
Funding
Needs verification
Deadline
2027.01.06
D-61
Official noticeApplyOverseas applicants not eligible ExportPDF

Overview

What you need to judge this in 30 seconds

SBIR · Phase: BOTH · Topic DON27BZ02-NV018 · Solicitation 27.BZ

Current composite airframe repair methodologies rely on a combination of wet-layups, B-staged epoxy prepregs, and bonded pre-cured thermoset patches. While pre-cured patches are the standard for high-quality depot repairs due to their autoclave-consolidated strength and “inspectability”, they present significant operational and logistical limitations. All these traditional methods require secondary adhesive bonding (using paste or film adhesives) to attach the repair to the airframe. This secondary bond is the inherent weak link of the repair, demanding long thermal cure cycles (often 4 to 24 hours), strict environmental controls, and burdensome cold-storage logistics (freezers) for the B-staged resins and adhesives. Furthermore, these out-of-autoclave epoxy repairs often struggle to meet the high service temperature requirements of advanced tactical aircraft. This SBIR topic seeks to evolve the current pre-cured repair methodology by transitioning from secondary adhesive bonding to high-speed fusion welding. The objective is to develop the capability to use pre-consolidated, high-temperature thermoplastic patches (e.g., Carbon/PEEK, Carbon/PEKK) on legacy thermoset aircraft (epoxy/Bismaleimide [BMI]). By replacing the lengthy adhesive cure cycle with a rapid welding process, this technology aims to achieve flight-ready repairs in expeditionary and carrier-based environments in a fraction of the time. Because thermoplastics melt and thermosets do not, achieving a structural weld between these dissimilar materials is the primary barrier to fielding this capability. The Department of War seeks complete thermoplastic patching solutions that incorporate the requisite chemical or mechanical interfacial enablers—such as plasma surface activation, novel chemical tie-layers, or laser-ablated mechanical interlocking. These enablers must allow the thermoplastic patch to successfully fuse with a fully cured, legacy thermoset airframe using portable ultrasonic, resistance- or -induction welding equipment. The outcome must be a deployable repair process that eliminates cold-storage logistics, restores full structural integrity, meets high service temperature demands, and drastically reduces Aircraft on Ground (AOG) time.

Category
R&D
Industry
Needs verification
Technology
Needs verification
Target stage
Needs verification
Project duration
Needs verification
Estimated preparation
Needs verification

Funding

Award size and how it is paid

Award range
Needs verification
Currency
USD
Total programme budget
Needs verification
Support type
Needs verification
Co-funding
Needs verification
Matching fund
Needs verification
Disbursement
Needs verification
Note
-

Eligibility

Can we actually apply?

Check whether we can applyEnter where you are incorporated, how old you are and how big — we compare it against this announcement and tell you what would unlock it. No sign-in needed.

SBIR/STTR 은 미국 중소기업만 지원할 수 있습니다(Small Business Act 법정 요건). • 계열사를 포함해 상시 종업원 500명 이하 • 미국 시민 또는 영주권자 1인 이상이 50%를 초과해 직접 소유·지배 • 미국 내 사업장을 두고 주로 미국 내에서 사업을 영위할 것 • 수행책임자(PI)의 주된 근무처가 신청 기업일 것 출처: https://www.sbir.gov/faq/eligibility-requirements

Company age
Needs verification
Employees
0명 ~ 500명
Revenue limits
Needs verification
Consortium
Needs verification

Location Requirements

Geography and legal-entity conditions

Primary country
🇺🇸 United States
Also eligible
None
Foreign companies
No
Local entity
Required
Location condition
미국 내 사업장을 두고 미국 시민·영주권자가 50%를 초과해 소유한 중소기업만 신청할 수 있습니다(법정 요건).

Required Documents

Required/optional · issuer · difficulty · validity · cautions

Document requirements were not captured (needs verification). Check the official announcement.

Application Process

How you apply

Application process not captured.

Evaluation

Review process and criteria

Evaluation process not captured.

Timeline

Announcement → intake → review → agreement → execution

Process steps were not captured.

Equity & Financial Terms

Equity, loans and contract conditions

Equity required
Needs verification
Loan
Non-dilutive grant
Duplicate funding
Needs verification
IP ownership
Needs verification
Deliverable ownership
Needs verification
Exclusivity
Needs verification
Right of first refusal
Needs verification
Audit & settlement
Needs verification

Risk Intelligence

Should we apply at all? — five dimensions plus an overall score (lower is safer)

No risk assessment yet. Re-analyse from Admin.

IP / Idea Protection

How much of your technology and idea you must disclose

No IP assessment yet.

AI Analysis

Pros · cons · difficulty · competition · attractiveness

Preparation difficultyNeeds verification

From paperwork and review stages

Competition (estimate)Needs verification

Heuristic from award size and type

AttractivenessNeeds verification

Amount, terms and IP combined

Overall riskNeeds verification

Weighted average of five dimensions

Pros
  • Needs verification
Cons
  • Needs verification
Cautions
  • Nothing flagged

Similar Programs

Comparable by type, country and technology

Source & Provenance

Every value carries its source URL and fetch time

Last fetched
2026.11.06
Human review
Not reviewed — check the official announcement
First seen
2026.11.06
Data status
Auto-collected, not reviewed
AI enrichment
Needs verification
Snapshot history
  • · 4h ago — 최초 수집 (b496af5c)