Low Cost Infrared Seeker
Overview
What you need to judge this in 30 seconds
SBIR · Phase: BOTH · Topic MDA27BZ02-DV001 · Solicitation 27.BZ
Develop a cost-effective IR interceptor seeker through methods such as novel material development, advanced manufacturing and/or scalability, novel commercial-off-the-shelf (COTS) integration, or other innovations that could reduce costs and maintain acceptable seeker performance. Both full seeker solutions and novel seeker components (focal plane array, readout integrated circuit, cooling system, telescope optics, etc.) are acceptable so long as cost savings are explicitly quantified in the proposal. A "full seeker" solution should include: Cover (if applicable), telescope assembly/ optical system (lenses, mirrors, filters, etc.), the IR sensor (filter, Focal Plane Arrays (FPAs) Readout Integrated Circuit, cooling systems (if applicable, etc.), gimbal system (as applicable), signal processing electronics, and the Final seeker production cost should be less than $150,000 for objective cost or less than $250,000 for threshold. Proposed solutions should be amenable to repeatable high throughput production processes. Proposal should include a plan for demonstration of seeker performance in a ground test facility. Additionally, proposers should identify the threat type(s) (ballistic, hypersonic, cruise missile, etc.) that are relevant to the proposed technology, and any assumptions made concerning the technology or its integration into the missile defense system should be explicitly referenced.
- Category
- R&D
- Industry
- Needs verification
- Technology
- Needs verification
- Target stage
- Needs verification
- Project duration
- Needs verification
- Estimated preparation
- Needs verification
Funding
Award size and how it is paid
- Award range
- Needs verification
- Currency
- USD
- Total programme budget
- Needs verification
- Support type
- Needs verification
- Co-funding
- Needs verification
- Matching fund
- Needs verification
- Disbursement
- Needs verification
- Note
- -
Eligibility
Can we actually apply?
SBIR/STTR 은 미국 중소기업만 지원할 수 있습니다(Small Business Act 법정 요건). • 계열사를 포함해 상시 종업원 500명 이하 • 미국 시민 또는 영주권자 1인 이상이 50%를 초과해 직접 소유·지배 • 미국 내 사업장을 두고 주로 미국 내에서 사업을 영위할 것 • 수행책임자(PI)의 주된 근무처가 신청 기업일 것 출처: https://www.sbir.gov/faq/eligibility-requirements
- Company age
- Needs verification
- Employees
- 0명 ~ 500명
- Revenue limits
- Needs verification
- Consortium
- Needs verification
Location Requirements
Geography and legal-entity conditions
- Primary country
- 🇺🇸 United States
- Also eligible
- None
- Foreign companies
- No
- Local entity
- Required
- Location condition
- 미국 내 사업장을 두고 미국 시민·영주권자가 50%를 초과해 소유한 중소기업만 신청할 수 있습니다(법정 요건).
Required Documents
Required/optional · issuer · difficulty · validity · cautions
Document requirements were not captured (needs verification). Check the official announcement.
Application Process
How you apply
Application process not captured.
Evaluation
Review process and criteria
Evaluation process not captured.
Timeline
Announcement → intake → review → agreement → execution
Process steps were not captured.
Equity & Financial Terms
Equity, loans and contract conditions
- Equity required
- Needs verification
- Loan
- Non-dilutive grant
- Duplicate funding
- Needs verification
- IP ownership
- Needs verification
- Deliverable ownership
- Needs verification
- Exclusivity
- Needs verification
- Right of first refusal
- Needs verification
- Audit & settlement
- Needs verification
Risk Intelligence
Should we apply at all? — five dimensions plus an overall score (lower is safer)
No risk assessment yet. Re-analyse from Admin.
IP / Idea Protection
How much of your technology and idea you must disclose
No IP assessment yet.
AI Analysis
Pros · cons · difficulty · competition · attractiveness
From paperwork and review stages
Heuristic from award size and type
Amount, terms and IP combined
Weighted average of five dimensions
- Needs verification
- Needs verification
- Nothing flagged
Similar Programs
Comparable by type, country and technology
- Rapidly Deployable Aerial Interdiction Cluster
🇺🇸 United States · R&D program · U.S. Department of War — MDA
Needs verificationD-61 - Mobile Sea-Based Launch Platform
🇺🇸 United States · R&D program · U.S. Department of War — MDA
Needs verificationD-61 - Performance Enhancement of Solid Rocket Motors Applied to Existing Systems
🇺🇸 United States · R&D program · U.S. Department of War — MDA
Needs verificationD-61 - Configurable Operator Decision Models for Constructive Test and Evaluation Simulations
🇺🇸 United States · R&D program · U.S. Department of War — MDA
Needs verificationD-61 - Multi-Fidelity Transfer Learning for Defense Applications
🇺🇸 United States · R&D program · U.S. Department of War — MDA
Needs verificationD-61
Source & Provenance
Every value carries its source URL and fetch time
- Official URL
- https://www.dodsbirsttr.mil/topics-app/
- Application URL
- https://www.dodsbirsttr.mil/topics-app/
- Last fetched
- 2026.11.06
- Human review
- Not reviewed — check the official announcement
- First seen
- 2026.11.06
- Data status
- Auto-collected, not reviewed
- AI enrichment
- Needs verification
- PRIMARYSBIR.gov topic — Low Cost Infrared Seeker
Fetched 4h ago
- HTMLSBIR/STTR 자격요건 (법정)
Fetched 4h ago
- HTML발주 기관 공식 공고
Fetched 4h ago
- · 4h ago — 최초 수집 (9e65a9a1)