Flightline Radio Network
Overview
What you need to judge this in 30 seconds
SBIR · Phase: BOTH · Topic DAF26BZ06-NV036 · Solicitation 26.BZ
Flight line operations at Edwards Air Force Base (AFB) face increasing demands for more efficient, secure, and real-time communication systems to enhance aircraft maintenance, logistics, and operational performance. Current communication solutions are limited by outdated infrastructure, lack of interoperability, and insufficient data transmission capabilities. There is a distinct opportunity to leverage advanced cellular network technologies, particularly 5G and Open Radio Access Network (Open RAN) architectures, to address these limitations and modernize the flight line environment. The objective of this SBIR Phase I project is to explore and develop innovative solutions utilizing cellular network infrastructure designed specifically for flight line applications. The aim is to create a secure, adaptable, and interoperable network that improves real-time communication, data sharing, and operational efficiency at Edwards AFB. The project will focus on enhancing ground crew coordination, enabling real-time aircraft health monitoring, and supporting predictive maintenance to reduce aircraft downtime and enhance mission readiness. Augmented reality (AR) applications will be integrated to provide maintenance personnel with real-time guidance, schematics, and remote support, further optimizing maintenance tasks. From a technical standpoint, the initiative will employ a 5G Open RAN architecture, offering increased flexibility, interoperability, and security while minimizing vendor lock-in and lowering costs. The modular design of this network will allow it to accommodate evolving test requirements and future upgrades, ensuring a scalable and cost-effective solution. The network will integrate seamlessly with Edwards AFB's existing infrastructure and employ efficient frequency allocation through spectrum sharing mechanisms. The anticipated Technology Readiness Level (TRL) at the start of this project is TRL 4, with a targeted advancement to TRL 6-7 by the end of Phase II. This progression will be achieved through a series of phased activities and deliverables: ● Phase I: Conduct feasibility studies and initial system design. This includes analyzing current flight line communication requirements, exploring Open RAN components, and developing foundational prototypes. Deliverables will include a comprehensive feasibility report, initial design schematics, and a preliminary prototype proof-of-concept. ● Phase II: Develop and refine prototype based on Phase I insights. Implementation of pilot deployments and rigorous testing to validate system performance and security. Deliverables will include a full-scale prototype, detailed test results, and an integration plan for transitioning the technology to operational use at Edwards AFB. The successful completion of this project is expected to significantly advance the DoD's technological state by providing a robust, future-proof communication solution tailored to the unique demands of flight line operations. This development aligns with modernization priorities such as Integrated Network System-of-Systems and Sustainment & Logistics, ultimately contributing to the operationally focused Advanced Battle Management System (ABMS).
- Category
- R&D
- Industry
- Needs verification
- Technology
- Needs verification
- Target stage
- Needs verification
- Project duration
- Needs verification
- Estimated preparation
- Needs verification
Funding
Award size and how it is paid
- Award range
- Needs verification
- Currency
- USD
- Total programme budget
- Needs verification
- Support type
- Needs verification
- Co-funding
- Needs verification
- Matching fund
- Needs verification
- Disbursement
- Needs verification
- Note
- -
Eligibility
Can we actually apply?
SBIR/STTR 은 미국 중소기업만 지원할 수 있습니다(Small Business Act 법정 요건). • 계열사를 포함해 상시 종업원 500명 이하 • 미국 시민 또는 영주권자 1인 이상이 50%를 초과해 직접 소유·지배 • 미국 내 사업장을 두고 주로 미국 내에서 사업을 영위할 것 • 수행책임자(PI)의 주된 근무처가 신청 기업일 것 출처: https://www.sbir.gov/faq/eligibility-requirements
- Company age
- Needs verification
- Employees
- 0명 ~ 500명
- Revenue limits
- Needs verification
- Consortium
- Needs verification
Location Requirements
Geography and legal-entity conditions
- Primary country
- 🇺🇸 United States
- Also eligible
- None
- Foreign companies
- No
- Local entity
- Required
- Location condition
- 미국 내 사업장을 두고 미국 시민·영주권자가 50%를 초과해 소유한 중소기업만 신청할 수 있습니다(법정 요건).
Required Documents
Required/optional · issuer · difficulty · validity · cautions
Document requirements were not captured (needs verification). Check the official announcement.
Application Process
How you apply
Application process not captured.
Evaluation
Review process and criteria
Evaluation process not captured.
Timeline
Announcement → intake → review → agreement → execution
Process steps were not captured.
Equity & Financial Terms
Equity, loans and contract conditions
- Equity required
- Needs verification
- Loan
- Non-dilutive grant
- Duplicate funding
- Needs verification
- IP ownership
- Needs verification
- Deliverable ownership
- Needs verification
- Exclusivity
- Needs verification
- Right of first refusal
- Needs verification
- Audit & settlement
- Needs verification
Risk Intelligence
Should we apply at all? — five dimensions plus an overall score (lower is safer)
No risk assessment yet. Re-analyse from Admin.
IP / Idea Protection
How much of your technology and idea you must disclose
No IP assessment yet.
AI Analysis
Pros · cons · difficulty · competition · attractiveness
From paperwork and review stages
Heuristic from award size and type
Amount, terms and IP combined
Weighted average of five dimensions
- Needs verification
- Needs verification
- Nothing flagged
Similar Programs
Comparable by type, country and technology
- Low Noise & Low-SWaP High-Repetition Rate Mode-Locked Lasers for High-Speed Photonics
🇺🇸 United States · R&D program · U.S. Department of War — USAF
Needs verificationD-6 - Ground and Air Launched Drone Swarms Create a Self-Protecting Perimeter Using Autonomous AI
🇺🇸 United States · R&D program · U.S. Department of War — USAF
Needs verificationD-6 - AI/ML for Next Generation of Missile Detection, Warning, Tracking, and Reporting
🇺🇸 United States · R&D program · U.S. Department of War — USAF
Needs verificationD-6 - Low-Cost Multi-Function Ku-Band RF System for Prompt Strike Weapons
🇺🇸 United States · R&D program · U.S. Department of War — USAF
Needs verificationD-6 - Low SWaP-C Tactical Awareness Payload for Proliferated, Agile Satellites (TAPPAS) for Space Domain Awareness
🇺🇸 United States · R&D program · U.S. Department of War — USAF
Needs verificationD-6
Source & Provenance
Every value carries its source URL and fetch time
- Official URL
- https://www.dodsbirsttr.mil/topics-app/
- Application URL
- https://www.dodsbirsttr.mil/topics-app/
- Last fetched
- 2026.10.15
- Human review
- Not reviewed — check the official announcement
- First seen
- 2026.10.15
- Data status
- Auto-collected, not reviewed
- AI enrichment
- Needs verification
- PRIMARYSBIR.gov topic — Flightline Radio Network
Fetched 3h ago
- HTMLSBIR/STTR 자격요건 (법정)
Fetched 3h ago
- HTML발주 기관 공식 공고
Fetched 3h ago
- · 3h ago — 최초 수집 (48143efc)