startup-tips
Sign in
OpenGrantAuto-collected, not reviewed

Desalination and Water Purification Research Program: Research Projects

🇺🇸 United States·Bureau of Reclamation(Government)
Funding
$100K ~ $800K
≈ ₩1.1B (FX as of 2026-07-01)
Deadline
2026.09.29
D-3
Official noticeApplyOverseas applicants not eligible Export

Overview

What you need to judge this in 30 seconds

The Bureau of Reclamation"s Desalination and Water Purification Research (DWPR) Program aims to increase water supplies by reducing the costs, energy requirements, and other barriers to adoption of treating impaired water for beneficial uses. This NOFO invites proposals from eligible applicants to conduct innovative laboratory and pilot-scale water treatment research. Strong applications will demo

Category
R&D
Industry
Energy & Climate
Technology
Needs verification
Target stage
Needs verification
Project duration
Needs verification
Estimated preparation
Needs verification

Funding

Award size and how it is paid

Award range
$100K ~ $800K
Currency
USD
Total programme budget
$5.7M
Support type
Cash
Co-funding
None (fully funded)
Matching fund
Needs verification
Disbursement
Needs verification
Note
-

Eligibility

Can we actually apply?

Check whether we can applyEnter where you are incorporated, how old you are and how big — we compare it against this announcement and tell you what would unlock it. No sign-in needed.

Foreign entities are not eligible for funding. Federal agencies are not eligible to apply. The program office will review all proposed projects to determine whether the application is an eligible activity under the NOFO and can proceed to merit review evaluation. Applicants can apply for two categories of projects under this NOFO:Laboratory-Scale Projects. Laboratory-scale projects are typically bench-scale studies involving small flow rates. These projects are used to determine the viability of a novel process, new materials, or process modifications. Laboratory-scale projects can also include modeling studies, decision support tools, literature and technology reviews, etc. that address objectives identified in the Program Goals section. Research at this stage can involve a high degree of risk and uncertainty. These projects should be completed within 24 months of award. Pilot-Scale Projects. Pilot-scale projects test a novel technology or process at a sufficiently large scale to determine the practicality of implementing the technology. These projects should involve flow rates above 1 gallon per minute and use natural water sources rather than synthetic or laboratory-made feed water. Pilot-scale studies are used to generate data over a sufficient time period that can be used to estimate the operational requirements (e.g., labor, chemical addition, power requirements) of the process and show performance with respect to finished water quality goals. Pilot-scale projects are generally preceded by laboratory studies (funded previously by the DWPR Program or others) that demonstrate technology feasibility. These projects should be completed within 36 months of award.Projects not eligible for funding under this NOFO include, but are not limited to:Proposals for planning activities eligible under the WaterSMART: Water Recycling and Desalination Planning funding opportunity,Proposals for the construction of permanent research facilities or infrastructure, andProposals fo…

Company age
Needs verification
Employees
Needs verification
Revenue limits
Needs verification
Consortium
Needs verification

Location Requirements

Geography and legal-entity conditions

Primary country
🇺🇸 United States
Also eligible
None
Foreign companies
No
Local entity
Needs verification
Location condition
A US federal programme: the applicant must be an eligible entity based in the United States.

Required Documents

Required/optional · issuer · difficulty · validity · cautions

Document requirements were not captured (needs verification). Check the official announcement.

Application Process

How you apply

Application process not captured.

Evaluation

Review process and criteria

Evaluation process not captured.

Timeline

Announcement → intake → review → agreement → execution

Process steps were not captured.

Equity & Financial Terms

Equity, loans and contract conditions

Equity required
Needs verification
Loan
Non-dilutive grant
Duplicate funding
Needs verification
IP ownership
Needs verification
Deliverable ownership
Needs verification
Exclusivity
Needs verification
Right of first refusal
Needs verification
Audit & settlement
Needs verification
  • Bayh-Dole government licence

    US federal R&D funding commonly carries a government licence clause.

    Source: Standard across grants.gov federal programmes — check the individual announcement.

Risk Intelligence

Should we apply at all? — five dimensions plus an overall score (lower is safer)

Overall: Not assessable (insufficient data)
Eligibility risk42

Chance of failing eligibility, location or legal-entity rules

Financial risk20

Co-funding, matching funds, reimbursement and loan exposure

Execution risk31

Paperwork load, timeline pressure, reporting and audit duties

Contract risk32

Exclusivity, right of first refusal, duplicate-funding limits

IP & idea exposure riskNeeds verification

How much technical detail you must hand over, and who owns it

Key risk factors
  • 16
    Overseas applicants not eligible

    Only domestically registered companies may apply.

  • 10
    Required documents not collected· evidence needs verification

    The list of required documents was not collected.

  • 9
    Deadline approaching

    The deadline is not far away.

  • 8
    Local-entity requirement not stated· evidence needs verification

    The announcement does not say whether a local entity is required.

  • 8
    Payment timing not stated· evidence needs verification

    Advance versus reimbursement makes a large difference to cash flow.

  • 7
    Exclusivity not stated· evidence needs verification

    Any exclusivity clause has to be checked.

  • 6
    Right of first refusal not stated· evidence needs verification

    Any right-of-first-refusal clause has to be checked.

  • 6
    Duplicate-support rule not stated· evidence needs verification

    Whether parallel support is allowed has to be confirmed.

13 item(s) need verification
  • · The list of required documents was not collected — check the announcement for what technical material must be submitted.
  • · Whether an NDA can be signed is not stated (needs verification).
  • · IP ownership terms are not stated (needs verification).
  • · Ownership of the deliverables is not stated (needs verification).
  • · Data-rights terms are not stated (needs verification).
  • · How submitted material may be reused is not stated (needs verification).
  • · Whether an exclusivity clause applies is not stated (needs verification).
  • · Whether a right of first refusal applies is not stated (needs verification).
  • · Whether a local entity is required is not stated (needs verification).
  • · Whether a matching fund is required is not stated (needs verification).
  • · Whether payment is in advance or in arrears is not stated (needs verification).
  • · The level of settlement and audit obligation is not stated (needs verification).
  • · The duplicate-support rule is not stated (needs verification).

Generated by local:rules-v1 · 10d ago

IP / Idea Protection

How much of your technology and idea you must disclose

Required documents unknown

The announcement does not say what has to be submitted, so the disclosure exposure cannot be judged. the scope of the material requested is not stated. The awarding body is Bureau of Reclamation. 8 fields could not be read and must be checked in the announcement and the grant agreement.

NDA
Needs verification
IP ownership
Needs verification
Deliverable ownership
Needs verification
Data rights
Needs verification
Disclosure depth
Needs verification
File patent first?
Not applicable
Reuse of submissions
Needs verification
Publicity obligation
Needs verification
Exposure score
Needs verification
Safe to disclose
  • · The problem your product solves, and the market definition
  • · Your value proposition and quantified results (improvement rates, throughput)
  • · Anything already public: granted patents, papers, press coverage
  • · Team composition, capabilities and a summary of past delivery
  • · Architecture-level diagrams at module granularity, without internal implementation
Keep to a minimum
  • · Core algorithms: formulae, hyper-parameters and pre-processing rules
  • · Raw training data and the details of your collection pipeline
  • · Full source code and build or deployment scripts
  • · Cost structure and unit-price formulae
  • · Named customers, contract terms and pricing
  • · How an unfiled invention is actually implemented
Recommended actions
  • MEDIUMRequest an NDA

    Ask in writing for a mutual NDA before submitting detailed technical material; if it is refused, keep what you submit at summary level.

5 evidence item(s) from the source
  • UNKNOWN

    No document list was collected, so the exposure of technical material cannot be judged.

    Source link
  • UNKNOWN

    No NDA clause could be found.

    Source link
  • UNKNOWN

    IP ownership terms could not be found.

    Source link
  • UNKNOWN

    Ownership of the deliverables terms could not be found.

    Source link
  • HIGH

    Bayh-Dole 정부 실시권: 미국 연방 R&D 자금 특성상 정부 실시권 조항이 적용될 수 있습니다.

    Quote: “grants.gov 연방 지원사업 공통 조항 — 개별 공고 확인 필요”

    Source link
Needs verification (8)
  • · The list of required documents was not collected — check the announcement for what technical material must be submitted.
  • · Whether an NDA can be signed is not stated (needs verification).
  • · IP ownership terms are not stated (needs verification).
  • · Ownership of the deliverables is not stated (needs verification).
  • · Data-rights terms are not stated (needs verification).
  • · How submitted material may be reused is not stated (needs verification).
  • · Whether an exclusivity clause applies is not stated (needs verification).
  • · Whether a right of first refusal applies is not stated (needs verification).

This assessment is derived from the stored announcement, document and contract fields. Anything the source does not state is marked "needs verification" — it never asserts that your idea will be taken. Generated by local:rules-v1 · 10d ago

AI Analysis

Pros · cons · difficulty · competition · attractiveness

Preparation difficultyNeeds verification

From paperwork and review stages

Competition (estimate)61

Heuristic from award size and type

Attractiveness80

Amount, terms and IP combined

Overall riskNeeds verification

Weighted average of five dimensions

Pros
  • + 자부담 없이 전액 지원됩니다.
Cons
  • − 현지 법인 설립이 필요합니다.
  • − 해외 기업은 지원할 수 없습니다.
Cautions
  • ! IP 귀속 조항이 확인되지 않았습니다 (확인 필요).
  • ! 중복 수혜 제한 규정을 사전에 확인하십시오.

Similar Programs

Comparable by type, country and technology

Source & Provenance

Every value carries its source URL and fetch time

Last fetched
2026.09.26
Human review
Not reviewed — check the official announcement
First seen
2026.08.20
Data status
Auto-collected, not reviewed
AI enrichment
local:rules-v1 · 2026.08.20
Sources (2)
Snapshot history
  • · 2026.08.20 — 최초 수집 (78f7fda1)