Cable Connector Enhancement
Overview
What you need to judge this in 30 seconds
STTR · Phase: BOTH · Topic DME26TZ05-NP001 · Solicitation 26.TZ
It is widely known that the cable to board connection is a common failure prone interface for electronics systems due to the thermal and mechanical stress they are exposed to. For new designs this connection can be engineered such that risk is lowered as much as reasonably possible but for existing design, there are limited options to overcome the difficulty of maintaining a strong reliable electrical connection in stressful environments. Potting PCBA and electronics assemblies offer great moisture, vibration and shock protection but when potting connectors the potting material is limited to the height of the connector below the electrical contact to prevent potting material from disrupting the connection between each end [3]. This ensures the board side of the connector is secure but not the full connection joint. That connection is still easily severed if it is strained beyond its mechanical limits, which for commercial grade connectors are a relatively low threshold. Commercial connectors could be swapped with more specialized connectors if they exist and the pad footprint on the board is still sufficient but removal of existing connectors from PCBAs still require considerable time for technicians. Reworking existing boards for the purpose of swapping the connector adds additional risk of board fallout from damage or thermal cycling. Repeated use of heat guns for removing and replacing a new connector or cable solution can degrade the heat affected zone and reduce reliability of the board and neighboring components. Especially for densely populated boards with limited distance from a connector to neighboring components which may prevent the use of a heat shield due to limited space. A heat shield can typically be used to avoid thermal and mechanical damage to adjacent components on a PCBA [4] Other options have the connector removed entirely in favor of a direct solder connection, be the board to cable or board to board. Alternative joining methods to replace the connector connection such as Hot Bar Soldering (HBS) can be cumbersome in both time and resources for small production efforts for any singular design. HBS uses pulse heated to reflow the solder material between a PCBA and the wire to form a strong junction [1]. The Hot Bar Solder (HBS) process for any given design requires tooling, fixturing and a compatible Anisotropic Conductive Film (ACF); the space between conductors, minimum pad area, the plating and substrates involved. For an existing connector footprint within a design compatible ACF may not exist and may not be able to be sourced in reasonable quantities as ACF is commonly sold by the case. While recent advancement exists for mitigating use of ACF [2] other challenges remain with design the tooling and the rework required to remove existing connectors. The design of the tool shape is critically important to the temperature distribution across the reflow area and has significant impact on the resultant mechanical and electrical properties achieved [1]. Tooling design and fabrication iterations increase schedule requirements for assembly efforts with increasing difficulty for adequate tooling shape on densely populated boards. These different paths or full board redesign and fabrication are expensive, time consuming and limited solutions because they are assembly specific. To enhance prototyping and system integration efforts a more versatile and efficient solution is needed to address this deficiency.
- Category
- R&D
- Industry
- Needs verification
- Technology
- Needs verification
- Target stage
- Needs verification
- Project duration
- Needs verification
- Estimated preparation
- Needs verification
Funding
Award size and how it is paid
- Award range
- Needs verification
- Currency
- USD
- Total programme budget
- Needs verification
- Support type
- Needs verification
- Co-funding
- Needs verification
- Matching fund
- Needs verification
- Disbursement
- Needs verification
- Note
- -
Eligibility
Can we actually apply?
SBIR/STTR 은 미국 중소기업만 지원할 수 있습니다(Small Business Act 법정 요건). • 계열사를 포함해 상시 종업원 500명 이하 • 미국 시민 또는 영주권자 1인 이상이 50%를 초과해 직접 소유·지배 • 미국 내 사업장을 두고 주로 미국 내에서 사업을 영위할 것 • 수행책임자(PI)의 주된 근무처가 신청 기업일 것 출처: https://www.sbir.gov/faq/eligibility-requirements
- Company age
- Needs verification
- Employees
- 0명 ~ 500명
- Revenue limits
- Needs verification
- Consortium
- Needs verification
Location Requirements
Geography and legal-entity conditions
- Primary country
- 🇺🇸 United States
- Also eligible
- None
- Foreign companies
- No
- Local entity
- Required
- Location condition
- 미국 내 사업장을 두고 미국 시민·영주권자가 50%를 초과해 소유한 중소기업만 신청할 수 있습니다(법정 요건).
Required Documents
Required/optional · issuer · difficulty · validity · cautions
Document requirements were not captured (needs verification). Check the official announcement.
Application Process
How you apply
Application process not captured.
Evaluation
Review process and criteria
Evaluation process not captured.
Timeline
Announcement → intake → review → agreement → execution
Process steps were not captured.
Equity & Financial Terms
Equity, loans and contract conditions
- Equity required
- Needs verification
- Loan
- Non-dilutive grant
- Duplicate funding
- Needs verification
- IP ownership
- Needs verification
- Deliverable ownership
- Needs verification
- Exclusivity
- Needs verification
- Right of first refusal
- Needs verification
- Audit & settlement
- Needs verification
Risk Intelligence
Should we apply at all? — five dimensions plus an overall score (lower is safer)
Chance of failing eligibility, location or legal-entity rules
Co-funding, matching funds, reimbursement and loan exposure
Paperwork load, timeline pressure, reporting and audit duties
Exclusivity, right of first refusal, duplicate-funding limits
How much technical detail you must hand over, and who owns it
- 18Local entity required
You cannot apply without an entity registered in that country.
- 16Overseas applicants not eligible
Only domestically registered companies may apply.
- 10Own contribution not stated· evidence needs verification
R&D and pilot programmes commonly require one. Confirm the ratio.
- 10Required documents not collected· evidence needs verification
The list of required documents was not collected.
- 8Payment timing not stated· evidence needs verification
Advance versus reimbursement makes a large difference to cash flow.
- 7Exclusivity not stated· evidence needs verification
Any exclusivity clause has to be checked.
- 6Award size not stated· evidence needs verification
The announcement does not state how much is available.
- 6Right of first refusal not stated· evidence needs verification
Any right-of-first-refusal clause has to be checked.
- · The list of required documents was not collected — check the announcement for what technical material must be submitted.
- · Whether an NDA can be signed is not stated (needs verification).
- · IP ownership terms are not stated (needs verification).
- · Ownership of the deliverables is not stated (needs verification).
- · Data-rights terms are not stated (needs verification).
- · How submitted material may be reused is not stated (needs verification).
- · Whether an exclusivity clause applies is not stated (needs verification).
- · Whether a right of first refusal applies is not stated (needs verification).
- · The required own-contribution ratio is not stated (needs verification).
- · Whether a matching fund is required is not stated (needs verification).
- · Whether payment is in advance or in arrears is not stated (needs verification).
- · The level of settlement and audit obligation is not stated (needs verification).
- · The award size is not stated (needs verification).
- · The duplicate-support rule is not stated (needs verification).
Generated by local:rules-v1 · 4h ago
IP / Idea Protection
How much of your technology and idea you must disclose
The announcement does not say what has to be submitted, so the disclosure exposure cannot be judged. the scope of the material requested is not stated. The awarding body is U.S. Department of War — DMEA. 8 fields could not be read and must be checked in the announcement and the grant agreement.
- NDA
- Needs verification
- IP ownership
- Needs verification
- Deliverable ownership
- Needs verification
- Data rights
- Needs verification
- Disclosure depth
- Needs verification
- File patent first?
- Not applicable
- Reuse of submissions
- Needs verification
- Publicity obligation
- Needs verification
- Exposure score
- Needs verification
- · The problem your product solves, and the market definition
- · Your value proposition and quantified results (improvement rates, throughput)
- · Anything already public: granted patents, papers, press coverage
- · Team composition, capabilities and a summary of past delivery
- · Architecture-level diagrams at module granularity, without internal implementation
- · Core algorithms: formulae, hyper-parameters and pre-processing rules
- · Raw training data and the details of your collection pipeline
- · Full source code and build or deployment scripts
- · Cost structure and unit-price formulae
- · Named customers, contract terms and pricing
- · How an unfiled invention is actually implemented
- HIGHPoC/공동개발 IP 귀속 조항 확인
공동개발 산출물의 지분·개선발명(improvement) 귀속·배경지식(background IP) 분리 조항을 협약서에서 확인하십시오.
- MEDIUMRequest an NDA
Ask in writing for a mutual NDA before submitting detailed technical material; if it is refused, keep what you submit at summary level.
4 evidence item(s) from the source
- UNKNOWN
No document list was collected, so the exposure of technical material cannot be judged.
Source link - UNKNOWN
No NDA clause could be found.
Source link - UNKNOWN
IP ownership terms could not be found.
Source link - UNKNOWN
Ownership of the deliverables terms could not be found.
Source link
- · The list of required documents was not collected — check the announcement for what technical material must be submitted.
- · Whether an NDA can be signed is not stated (needs verification).
- · IP ownership terms are not stated (needs verification).
- · Ownership of the deliverables is not stated (needs verification).
- · Data-rights terms are not stated (needs verification).
- · How submitted material may be reused is not stated (needs verification).
- · Whether an exclusivity clause applies is not stated (needs verification).
- · Whether a right of first refusal applies is not stated (needs verification).
This assessment is derived from the stored announcement, document and contract fields. Anything the source does not state is marked "needs verification" — it never asserts that your idea will be taken. Generated by local:rules-v1 · 4h ago
AI Analysis
Pros · cons · difficulty · competition · attractiveness
From paperwork and review stages
Heuristic from award size and type
Amount, terms and IP combined
Weighted average of five dimensions
- Needs verification
- − 현지 법인 설립이 필요합니다.
- − 해외 기업은 지원할 수 없습니다.
- ! IP 귀속 조항이 확인되지 않았습니다 (확인 필요).
- ! 중복 수혜 제한 규정을 사전에 확인하십시오.
Similar Programs
Comparable by type, country and technology
- Additive Manufacturing for Flexible Electronics
🇺🇸 United States · R&D program · U.S. Department of War — DMEA
Needs verificationD-34 - Development of devices, diagnostic technologies, or digital health tools for treatment, detection, and diagnosis of Pediatric Cancers and/or Rare Cancers.
🇺🇸 United States · R&D program · U.S. Department of Health and Human Services — NIH
Needs verificationD-32 - Development of therapeutic or preventative technologies for treatment or prevention of Pediatric Cancers and/or Rare Cancers.
🇺🇸 United States · R&D program · U.S. Department of Health and Human Services — NIH
Needs verificationD-32 - SBIR/STTR Commercialization Readiness Pilot (CRP) Program (Parent SB1 Clinical Trial Optional)
🇺🇸 United States · R&D program · U.S. Department of Health and Human Services
Needs verificationD-229 - NIH, CDC and FDA Small Business Innovation Research Grant (Parent SBIR [R43/R44] Clinical Trial Optional)
🇺🇸 United States · R&D program · U.S. Department of Health and Human Services
Needs verificationD-229
Source & Provenance
Every value carries its source URL and fetch time
- Official URL
- https://www.dodsbirsttr.mil/topics-app/
- Application URL
- https://www.dodsbirsttr.mil/topics-app/
- Last fetched
- 2026.08.20
- Human review
- Not reviewed — check the official announcement
- First seen
- 2026.08.20
- Data status
- Auto-collected, not reviewed
- AI enrichment
- local:rules-v1 · 4h ago
- PRIMARYSBIR.gov topic — Cable Connector Enhancement
Fetched 2h ago
- HTMLSBIR/STTR 자격요건 (법정)
Fetched 2h ago
- HTML발주 기관 공식 공고
Fetched 2h ago
- · 4h ago — 최초 수집 (1b55c994)