startup-tips
Sign in
ClosedR&D programAuto-collected, not reviewed

Agile Wire Harness Manipulation and Installation for Unmanned Aerial Systems

🇺🇸 United States·U.S. Department of War — USAF(Government)
Funding
Needs verification
Deadline
2026.11.25
D-49
Official noticeApplyOverseas applicants not eligible ExportPDF

Overview

What you need to judge this in 30 seconds

SBIR · Phase: BOTH · Topic DAF27BZ01-DV011 · Solicitation 27.BZ

Context & BackgroundModern Department of Defense (DoD) manufacturing and depot sustainment environments increasingly depend on agile automation to scale up production and maintain rapid operational readiness. While automated assembly technologies have matured substantially for rigid components with predictable geometries, the handling of flexible materials remains a persistent challenge. Specifically, wire harness routing, connector inspection, and insertion operations are ubiquitous across the production lines of Unmanned Aerial Systems (UAS), advanced munitions families, and autonomous collaborative platforms. Currently, these intricate electrical assembly processes represent a bottleneck in UAS assembly operations. Assembly technicians must manually route non-rigid cables through confined structural cavities and execute high-precision connection steps under high-mix, low-volume production conditions. Traditional industrial robotics break down when tasked with these operations because flexible wiring deforms unpredictably during manipulation, completely violating the rigid-part assumptions and fixed, hard-tooled rules of standard automation. Problem, Opportunity, & Unmet Need The complete reliance on manual wire harness installation creates a critical capability deficiency that severely penalizes DoD manufacturing agility and surge capacity. Manual operations are fundamentally non-scalable, meaning production lines cannot dynamically "ramp-to-rate" to meet sudden spikes in theater demand. Furthermore, manual wire routing and insertion introduce human-induced variability, resulting in unquantifiable defects such as partially seated connectors, overstressed wires, or compromised bend radii. These latent defects frequently slip past standard visual inspections and surface as catastrophic electrical or communication failures during critical mission times. Aerospace prime contractors and program offices have identified this manual chokepoint as the largest automation gap in UAS and munitions production. This deficiency creates a major opportunity to implement a flexible automation solution. Resolving this challenge requires a modular, adaptive robotic workcell that handles deformable materials, operates with high positional accuracy in restricted footprints, and can be rapidly retasked between completely different product designs within a single factory shift. Desired Outcome & Technological Improvement The desired outcome of this research and development effort is a fully integrated, single-arm modular robotic manufacturing workcell capable of autonomously handling the core manipulation and installation scenarios for flexible UAS and munitions wiring harnesses. Shifting the technology from manual assembly to adaptive, sensor-driven automation will fundamentally advance the DoD technological state of the art by achieving the following targeted improvements: Deformable Material Control: The platform will combine deterministic offline path planning with adaptive, real-time online sensory feedback (such as tactile, force-torque, and vision monitoring). This closed-loop configuration enables "search and settle" machine behaviors to dynamically correct for micro-misalignments and part variability on the fly. Sub-Millimeter Tolerances: The workcell will successfully execute precise connector insertion and blind-mate assembly steps within tightly constrained geometries to a targeted positioning tolerance of $\le$ 0.5 mm.Rapid Retaskability: The system will break the paradigm of dedicated single-product manufacturing by allowing shop-floor operators to ingest new geometric data and completely retask the workcell to a novel harness family in less than 8 hours.End-to-End Digital Thread: The workcell will generate machine-readable traceability records of every insertion force profile and routing path. This delivers a reliable data audit trail to eliminate quality escapes and predict latent field defects before they manifest in flight.Minim…

Category
R&D
Industry
Needs verification
Technology
Needs verification
Target stage
Needs verification
Project duration
Needs verification
Estimated preparation
Needs verification

Funding

Award size and how it is paid

Award range
Needs verification
Currency
USD
Total programme budget
Needs verification
Support type
Needs verification
Co-funding
Needs verification
Matching fund
Needs verification
Disbursement
Needs verification
Note
-

Eligibility

Can we actually apply?

Check whether we can applyEnter where you are incorporated, how old you are and how big — we compare it against this announcement and tell you what would unlock it. No sign-in needed.

SBIR/STTR 은 미국 중소기업만 지원할 수 있습니다(Small Business Act 법정 요건). • 계열사를 포함해 상시 종업원 500명 이하 • 미국 시민 또는 영주권자 1인 이상이 50%를 초과해 직접 소유·지배 • 미국 내 사업장을 두고 주로 미국 내에서 사업을 영위할 것 • 수행책임자(PI)의 주된 근무처가 신청 기업일 것 출처: https://www.sbir.gov/faq/eligibility-requirements

Company age
Needs verification
Employees
0명 ~ 500명
Revenue limits
Needs verification
Consortium
Needs verification

Location Requirements

Geography and legal-entity conditions

Primary country
🇺🇸 United States
Also eligible
None
Foreign companies
No
Local entity
Required
Location condition
미국 내 사업장을 두고 미국 시민·영주권자가 50%를 초과해 소유한 중소기업만 신청할 수 있습니다(법정 요건).

Required Documents

Required/optional · issuer · difficulty · validity · cautions

Document requirements were not captured (needs verification). Check the official announcement.

Application Process

How you apply

Application process not captured.

Evaluation

Review process and criteria

Evaluation process not captured.

Timeline

Announcement → intake → review → agreement → execution

Process steps were not captured.

Equity & Financial Terms

Equity, loans and contract conditions

Equity required
Needs verification
Loan
Non-dilutive grant
Duplicate funding
Needs verification
IP ownership
Needs verification
Deliverable ownership
Needs verification
Exclusivity
Needs verification
Right of first refusal
Needs verification
Audit & settlement
Needs verification

Risk Intelligence

Should we apply at all? — five dimensions plus an overall score (lower is safer)

No risk assessment yet. Re-analyse from Admin.

IP / Idea Protection

How much of your technology and idea you must disclose

No IP assessment yet.

AI Analysis

Pros · cons · difficulty · competition · attractiveness

Preparation difficultyNeeds verification

From paperwork and review stages

Competition (estimate)Needs verification

Heuristic from award size and type

AttractivenessNeeds verification

Amount, terms and IP combined

Overall riskNeeds verification

Weighted average of five dimensions

Pros
  • Needs verification
Cons
  • Needs verification
Cautions
  • Nothing flagged

Similar Programs

Comparable by type, country and technology

Source & Provenance

Every value carries its source URL and fetch time

Last fetched
2026.10.07
Human review
Not reviewed — check the official announcement
First seen
2026.10.07
Data status
Auto-collected, not reviewed
AI enrichment
Needs verification
Snapshot history
  • · 2h ago — 최초 수집 (cb5c51ae)