startup-tips
Sign in
ClosedR&D programAuto-collected, not reviewed

Advanced Reserve Power Source Technologies

🇺🇸 United States·U.S. Department of War — USAF(Government)
Funding
Needs verification
Deadline
2026.11.25
D-49
Official noticeApplyOverseas applicants not eligible ExportPDF

Overview

What you need to judge this in 30 seconds

SBIR · Phase: BOTH · Topic DAF27BZ01-DV013 · Solicitation 27.BZ

Power source performance in terms of power and energy density is the major objective with affordability, safety, and reliability secondary objectives of Air Force Armament Directorate programs for advanced reserve power sources for weapon systems. Secondary objectives are not distant relative to the major objective, but power and energy density is emphasized in order to enable new concepts and integration strategies. Current reserve thermally activated battery technology is at risk of becoming obsolete due to increasing specific power and specific energy requirements, while other battery technologies with similar or greater specific energy suffer from multiple failure modes, have limited storage life, or have not been tailored to meet the unique requirements for Air Force weapon programs. An advanced reserve power source lasting 20+ years without the need for maintenance or significant energy loss while in storage, is reliable, and is inherently safe, e.g. is not susceptible to thermal runaway, is required. Weapons typically have storage lifetimes of 20+ years; and must maintain reliable operation at any point within this time period without the power source being inadvertently activated. When the power source is activated, it must rise to full voltage within 600 ms and have an activated life of 5+ minutes. The power source must be able to survive shock, vibration, and temperatures (MIL-HDBK-310 1% Hot/ 1% Cold Days, worldwide) associated with external and internal carriage, high speed free flight, and storage environments. The power source will be required to provide power for weapon avionics, guidance, and ordnance initiation events for the entire flight profile. The load on the power source must be capable of periods of pulse power with an average 2.5 kW/kg minimum and a goal to exceed 5 kW/kg load over 60 seconds. The goal of this technology development is to design, develop, and test an advanced design for a power source capable of 20+ years of storage, 5+ minutes of activated life, with a specific energy at a minimum of 40 Wh/kg and a goal to exceed 100 Wh/kg. The power source must be inherently safe during its entire lifetime. Due to the safety issues associated with lithium battery technologies and the process to receive certification through the Naval Ordnance Security and Safety Activity (NOSSA) for use on an ordnance system, lithium battery technologies will need to demonstrate no venting under NAVSEA S9310-AQ-SAF-010 test conditions.

Category
R&D
Industry
Needs verification
Technology
Needs verification
Target stage
Needs verification
Project duration
Needs verification
Estimated preparation
Needs verification

Funding

Award size and how it is paid

Award range
Needs verification
Currency
USD
Total programme budget
Needs verification
Support type
Needs verification
Co-funding
Needs verification
Matching fund
Needs verification
Disbursement
Needs verification
Note
-

Eligibility

Can we actually apply?

Check whether we can applyEnter where you are incorporated, how old you are and how big — we compare it against this announcement and tell you what would unlock it. No sign-in needed.

SBIR/STTR 은 미국 중소기업만 지원할 수 있습니다(Small Business Act 법정 요건). • 계열사를 포함해 상시 종업원 500명 이하 • 미국 시민 또는 영주권자 1인 이상이 50%를 초과해 직접 소유·지배 • 미국 내 사업장을 두고 주로 미국 내에서 사업을 영위할 것 • 수행책임자(PI)의 주된 근무처가 신청 기업일 것 출처: https://www.sbir.gov/faq/eligibility-requirements

Company age
Needs verification
Employees
0명 ~ 500명
Revenue limits
Needs verification
Consortium
Needs verification

Location Requirements

Geography and legal-entity conditions

Primary country
🇺🇸 United States
Also eligible
None
Foreign companies
No
Local entity
Required
Location condition
미국 내 사업장을 두고 미국 시민·영주권자가 50%를 초과해 소유한 중소기업만 신청할 수 있습니다(법정 요건).

Required Documents

Required/optional · issuer · difficulty · validity · cautions

Document requirements were not captured (needs verification). Check the official announcement.

Application Process

How you apply

Application process not captured.

Evaluation

Review process and criteria

Evaluation process not captured.

Timeline

Announcement → intake → review → agreement → execution

Process steps were not captured.

Equity & Financial Terms

Equity, loans and contract conditions

Equity required
Needs verification
Loan
Non-dilutive grant
Duplicate funding
Needs verification
IP ownership
Needs verification
Deliverable ownership
Needs verification
Exclusivity
Needs verification
Right of first refusal
Needs verification
Audit & settlement
Needs verification

Risk Intelligence

Should we apply at all? — five dimensions plus an overall score (lower is safer)

No risk assessment yet. Re-analyse from Admin.

IP / Idea Protection

How much of your technology and idea you must disclose

No IP assessment yet.

AI Analysis

Pros · cons · difficulty · competition · attractiveness

Preparation difficultyNeeds verification

From paperwork and review stages

Competition (estimate)Needs verification

Heuristic from award size and type

AttractivenessNeeds verification

Amount, terms and IP combined

Overall riskNeeds verification

Weighted average of five dimensions

Pros
  • Needs verification
Cons
  • Needs verification
Cautions
  • Nothing flagged

Similar Programs

Comparable by type, country and technology

Source & Provenance

Every value carries its source URL and fetch time

Last fetched
2026.10.07
Human review
Not reviewed — check the official announcement
First seen
2026.10.07
Data status
Auto-collected, not reviewed
AI enrichment
Needs verification
Snapshot history
  • · 2h ago — 최초 수집 (fa30ddfc)